Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13691353

- Product Categories
- Friendly Links
- home > Supply > Single county fire wall insulation board extruded plate lacquer factory upset supply
Information Name: | Single county fire wall insulation board extruded plate lacquer factory upset supply |
Published: | 2015-04-08 |
Validity: | 3066 |
Specifications: | 1.00 * 1536 |
Quantity: | 1958614.00 |
Price Description: | |
Detailed Product Description: | Friends of Hanson is a subsidiary of Shandong Sai Deli, construction conditions 1, the primary wall is acceptance. Door frames and various body wall into the family line, downspouts bracket, embedded parts, such as the installation is completed according to the design. 2, shear wall flatness with 2m by foot inspection, the maximum deviation is greater than 3:00, the application of 2 cm thick 1: 3 crack insulation mortar; the maximum deviation of less than 4:00, uneven place with 1: 3 crack repair insulation mortar smooth. 3, 2 cm thick masonry walls with 1: 3 insulation mortar cracking. 4, the primary wall and leveling layer should be in a dry state. 5, the construction site of the wall surface temperature and the ambient temperature within 24 hours after the construction of not less than 5 ℃, wind less five. 6, when the summer construction should take effective measures to prevent the rain washed walls. Second, the construction of electric wire cutting tool, a slotted, a wallpaper knife, screwdriver, hacksaw, scissors, electric mixer, impact drill, hammer, brush, coarse sandpaper and common tools. Third, the construction process with a special adhesive primary wall treatment: a brush interface agent, paste exterior insulation board, pre-glued panels edge mesh cloth drilling and installation of fixtures, insulation board leveling grinding, brush interface agent a , wiping cracking insulation mortar paste mesh, wipe the surface layer of polymer mortar, embedded with a special tile adhesive sealant spray (painted) surface coating or paste tile, cleaning floor finishes, acceptance Fourth, the construction operation points 1, the primary treatment to completely remove the adhesive strength of the material impact of the primary wall surface from dust, grease, release agents, such as hollowing and weathering. 2, to enhance the insulation board and base and surface adhesion, insulation board should brush both sides of each one interface agent. 3, configure special binder: 1) mixture of 5 parts (by weight) of dry mortar into a clean plastic bucket, add 1 part water, addition of water should be stirred and then stirred with an electric mixer for 5-8 minutes, until Stir, and the consistency is moderate so far. 2) adhesive stand for 5 minutes, then stir to use, configure good adhesive should be used within one hour. 3) special binder configuration to permit only added water, not allowed to join other additives (agents). 4, install insulation plate board 1) standard board size, diagonal error is less than 2, insulation board with an electric wire cutting device or tool knife cutting, size tolerance of ± 1.5. 2) Mesh turning package: window and door openings, etc. extrusion Deformation sides sticky mesh pre-board, with a total width of about 200, turning bag part of the width of 80, which would be as follows: Mesh cutting length 180 plus thickness. First part of the package in turn wipe length 80 width of special binder 2 and then pressed into 80 long mesh, the remaining thrown aside. 3) The special adhesive applicator configured behind the insulation board, adhesive compacted thickness of about 3, in order to ensure a strong bond, bonding method and the method can be used sticky strip strip-point method. 4) stick method: mouth tooth trowel dedicated binder wipe horizontally uniform insulation board, strip width 10, thickness 10, 50 in the distance. 5) point method: trowel in each insulation board peripheral and intermediate wiping width of 50 and a thickness of 10 special binder, and then wipe the area in the insulation board to separate a diameter of 100 and a thickness of 10 ash cake. 6) will wipe good special adhesive insulation board quickly pasted on the wall, in order to prevent surface crust and lose adhesion effect. Shall not apply insulation board dedicated adhesive side. 7) insulation board wall glue, apply two meters by foot to flatten operation, to ensure its flatness and paste firmly to squeeze tightly between the board and the board, without joints, cracks formed by cutting is not straight, with insulation board Article stuffed and polished. Each sticky finish a board should clear out the special binder. 8) insulation board pasted bottom-up should be sub-horizontal direction transverse Stones, each row of panels should be staggered joint 1/2 plate length, the local minimum of not less than 100 sewing wrong. 5, the mounting bracket: 1) start the installation fasteners paste eight hours in the insulation board and be completed within the next 24 hours. According to the design requirements of the position with percussion drill, aperture 10, the primary wall drill depth of about 60, the primary wall anchors depth of about 50, in order to ensure solid and reliable. 2) a fixed number of pieces according to design specification requirements set higher floors anchors should be gradually increased. 3) self-tapping screws should be tight squeeze and expansion nail cap with plastic insulation board surface or slightly screwing some neat ensure expansion nail twist tail back to the primary wall full anchor. 6, polish: 1) insulation board joints uneven application at coarse sandpaper, action is gentle circular motion, do not sand along a direction parallel to the insulation board joints. 2) insulation board promptly debris and floating dust after sanding with a brush to clean. 7, for decorative line angle: 1) according to the design requirements needs to be done with ink lines pop line angle position, and horizontal and vertical correction. 2) using the slotted groove angle will cut notch insulation board, insulation board notch thinnest not less than 15. 3) the convex line angle should be designed to cut to size, the angle and the corresponding line on both sides of the insulation board a brush interface agent, and then painted with special adhesive, making it a solid paste. 8, wipe the bottom insulation cracking mortar: 1) thermal insulation mortar crack configurations with special adhesive. 2) The thermal insulation configured crack spread evenly in the insulation board thickness of 2 cm. 9, the pressure network Plaid: 1) Mesh should face cropped length and width requirements, and should stay out of the lap width. Mesh cut should shun the latitude and longitude to carry out. 2) windows and doors and other openings in the fence week Plaid turning package, the four corners of the additional layer of mesh should be strengthened, the whole mesh should be in the hole around the turn on the package and additional mesh. |
Admin>>>
You are the 6143 visitor
Copyright © GuangDong ICP No. 10089450, Hanson Chemical Co., Ltd., Jinan Three Friends All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6143 visitor
Copyright © GuangDong ICP No. 10089450, Hanson Chemical Co., Ltd., Jinan Three Friends All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility